Monday, December 26, 2011

It's the end of the REBUILD Project

The final step in the house's wind mitigation rebuild was today's installation of new impact-resistant garage doors.

Assembling the new garage doors.
Installing the new impact-resistant garage doors.

We got a call last week to expect the installers on Monday between 8:00 and 10:00 A.M. They arrived at 9:45.

As with all the REBUILD Northwest Florida work, replacing the doors was a noisy process. And this procedure took longer than the earlier ones. The two installers were here over six hours. It seemed that one of them was a trainee and he was doing a solo installation of one of the doors.

Reinforced garage door panels.
The new, reinforced door panels -- ready to install. They are much stronger than the old doors.

Almost all of the retrofitting is invisible. You can see the new garage doors but the old doors were in great condition, so the new doors look about the same. The rest of the work was inside walls, under soffits or in the attic. Invisible.

Final inspection comes next.

Saturday, December 24, 2011

Thursday, December 15, 2011

Hurricane Shutters

Hurricane shuttersThe hurricane shutters are installed and stored away in the garage. We are ready for the next big storm.

At 9:30 A.M., right on time, an installer arrived. A few minutes later another one appeared. After lots of very loud drilling of holes and the placement of anchor screws they were finished right at noon. Done.

We have a total of ten windows, including a set of French doors leading to the backyard.

The shutters consist of overlapping galvanized steel panels, about a foot wide and as tall as the window plus a few inches to fit over anchor pins. The panels are attached at each end with washers and wing nuts.

The panels stored away in the garage.When not covering the windows the panels fit together in one neat cluster in the garage. The footprint for shutter panels for all ten windows is amazingly small, about a square foot.

Now there's one final step, we get new, reinforced garage doors.

Wednesday, December 14, 2011

REBUILD Northwest Florida, continued

The last work done by the REBUILD folks was on December 1. Since then no one had called regarding the last two steps in the retrofitting of the house. At 5:30 P.M. today we got a call from the people who install the window covers: they can come tomorrow morning and start work between 9:00 and 10:00. It should take about three hours.

They must have had a cancellation.

Thursday, December 01, 2011

Reinforcing the Roof, Day 3


A pickup truck, with a crew of two men, arrived with a big trailer
full of hoses, heaters, pumps and goo.


Today there's another crew here to inject a foam adhesive sealant into all the roof-to-wall connections. This is done with pressure hoses. They got here a little after 1:00 P.M. and spent an hour assembling hoses, heaters and goo. The goo apparently has to be heated then sent up a hose to the guys in the attic.

There should be no discomfort to the residents of the house. The fumes are totally safe to breathe. But "it would be a good idea to air out the house for a couple of hours" after they are finished. They were finished around 4:30.

The installers were wearing hazmat suits and they were breathing through respirators.
Two more steps and we will be finished with REBUILD Northwest Florida:
(1) new, reinforced garage doors;
(2) shutters on all the windows and over the French doors to the backyard.